March saw Glenco correcteting some issues with an old cobbled crossover at the entrance to Millers Court in Chiswick West London. There was some historical subsidence and concrete heave to the cobbled section of the crossover. This was preventing surface water from flowing across the cobbles to the surface water gullies on the other side, resulting in standing water issues. Affected areas of the crossover were broken out and the same coobbles cleaned and prepared for reuse. With correct levels established cobbles were relaid on a strong concrete mortar mix and relaid to the original pattern to match the adjoining areas and then carefully pointed in with wetmix concrete. Surface water was finally able to flow through the gutter section of the crossover to the original gullies. Small adjustments to targeted areas can make a substantial overall improvement – bringing quality to the surface!
Millers Court London – Cobbled Crossover